Concrete Steps Calculator - Rise, Run, Landing, Bags

    How many bags for the front steps? Enter the total rise, tread depth, width and landing to get equal code-limit risers, the total run, cubic yards of concrete and the bag count.

    Parameters

    Enter data for calculations

    Ground to top of landing or porch

    Front to back of each step

    Side to side

    Empty = steps up to an existing porch

    Sets the tallest allowed riser

    Premixed concrete bags

    Empty = 10%

    Form progress0 / 5 fields

    💡 Fill in all required fields to unlock the calculate button

    Concrete for steps, worked out from the rise

    Measure how high the steps have to climb, choose a tread depth and width, and this concrete steps calculator splits the height into equal risers within the code limit, then returns the cubic yards and the number of bags for solid steps poured on grade. Three steps up to a 36 in. landing on a 28 in. rise, 4 ft wide, hold 40.83 cu ft of concrete: 1.66 cu yd or 75 bags of 80 lb with 10% waste.

    The result also lists each level with its height and volume, the total run in front of the door, and any dimension that falls below the IRC or IBC minimum.

    What to measure, and where from

    1. Total rise - inches from the finished ground (or walk) at the bottom to the top of the landing or porch. Measure with a level and tape at the spot where the bottom step will land, since ground slopes.
    2. Tread depth - front to back of each step in inches. 11 in. is a common choice; the IRC minimum is 10 in.
    3. Width - side to side in feet. 4 ft is typical for a front entry; the IRC minimum is 36 in.
    4. Landing depth - inches of platform at the top, poured with the steps. Leave it empty when the steps end against an existing porch or slab.
    5. Code - IRC for a house (riser up to 7 3/4 in.) or IBC for commercial and multifamily work (4 to 7 in.).
    6. Bag size and waste - 40, 60 or 80 lb bags; 10% waste unless you choose 5% or 15%.

    Same steps, with and without a landing

    Most of the concrete in a set of entry steps is not in the steps. It is in the landing, because the landing is the tallest block and the deepest one. Here is the same 28 in. rise, 11 in. treads and 4 ft width, run twice.

    Before: steps up to an existing porch

    4 risers of 7 in., 3 treads, no landing poured. Solid volume 12.83 cu ft, ordered as 0.52 cu yd or 24 bags of 80 lb.

    After: steps with a 36 in. landing

    The same 4 risers and 3 treads plus a 36 x 48 in. platform at 28 in. high. Solid volume 40.83 cu ft, ordered as 1.66 cu yd or 75 bags.

    The landing alone adds 28 cu ft, more than twice the three steps together. That is why many builders fill the core of a tall landing with compacted gravel or rubble before the pour, or build it as a hollow form; both cut the bag count sharply. This calculator assumes solid concrete, so its number is the upper bound.

    Rise, run and the code limits behind them

    The calculator divides the total rise by the riser limit and rounds up, so every riser comes out equal and at or under the limit. A 28 in. rise is 3.6 risers of 7 3/4 in., which becomes 4 risers of exactly 7 in. Equal risers matter: the IRC allows no more than 3/8 in. of difference between the tallest and shortest riser in a flight.

    DimensionIRC (houses)IBC (other buildings)
    Riser height7 3/4 in. max (R311.7.5.1)4 to 7 in. (1011.5.2)
    Tread depth10 in. min (R311.7.5.2)11 in. min (1011.5.2)
    Stair width36 in. min (R311.7.1)44 in. min, 36 in. under 50 occupants (1011.2)
    Landing depth36 in. min in the direction of travel (R311.7.6)at least the stair width, up to 48 in. on a straight run (1011.6)
    Handrailflights with 4 or more risers (R311.7.8)on each side, with exceptions (1011.11)

    Codes are adopted locally and sometimes amended, so the building department has the last word. Comfort is a separate check: two risers plus one tread of about 24 to 25 in. tends to feel natural underfoot, and the result shows that sum for your steps.

    Eight porches, from one step to five

    All rows use 11 in. treads, IRC limits and 80 lb bags with 10% waste unless noted. The bag count is what the calculator rounds up to; cubic yards include the waste.

    Rise, width, landingRisersSolid volumeTo order
    7 in., 5 ft, 48 in. landing, 60 lb bags1 of 7 in.11.67 cu ft29 bags (0.48 cu yd)
    14 in., 5 ft, 48 in. landing2 of 7 in.26.01 cu ft48 bags (1.06 cu yd)
    21 in., 4 ft, to a porch, 60 lb bags3 of 7 in.6.42 cu ft16 bags (0.26 cu yd)
    22 in., 3 ft, to a porch3 of 7 5/16 in.5.04 cu ft10 bags (0.21 cu yd)
    28 in., 4 ft, to a porch4 of 7 in.12.83 cu ft24 bags (0.52 cu yd)
    28 in., 4 ft, 36 in. landing4 of 7 in.40.83 cu ft75 bags (1.66 cu yd)
    28 in., 5 ft, 36 in. landing, IBC, 12 in. treads4 of 7 in.52.50 cu ft97 bags (2.14 cu yd)
    36 in., 6 ft, 36 in. landing5 of 7 3/16 in.87.00 cu ft160 bags (3.54 cu yd)

    Above about one cubic yard the bag count climbs fast: 160 bags of 80 lb is over 6 tons to mix by hand. Ready-mix is ordered by the cubic yard, so the cu yd figure is the one to give the plant, and the result suggests comparing the two once you pass 1 cu yd.

    How the volume is built up

    Seen from the side, solid steps are a row of rectangles, each one as tall as the step it carries. With n risers of height R, treads T, landing depth D and width W (all in inches), the steps hold W x R x T x (1 + 2 + ... + (n - 1)) and the landing W x D x n x R. Divide cubic inches by 1,728 for cubic feet and by 27 again for cubic yards. Bags use Quikrete's yields for Concrete Mix: about 0.30, 0.45 and 0.60 cu ft for 40, 60 and 80 lb.

    Concrete step questions

    How much concrete do I need for 3 steps?

    Three steps of 7 in. by 11 in., 4 ft wide, up to an existing porch take 6.42 cu ft solid, which is 16 bags of 60 lb or 12 bags of 80 lb with 10% waste. Add a landing and the number jumps, as the comparison above shows.

    Do I count the top of the porch as a step?

    No. Count risers, not treads: the porch or landing is the top of the last riser. A 28 in. rise has 4 risers and 3 treads, and the landing is where you step onto the fourth level.

    Can I fill the inside of the steps with gravel?

    Many builders do, especially under a tall landing, leaving a shell of concrete over compacted fill. The calculator gives the solid volume, so subtract the fill you plan to place. Footing depth below the frost line and any reinforcement are set by local code and the job, not by this tool.

    Why are my risers 7 5/16 in. and not a round number?

    Because the total rise sets them. A 22 in. rise split into three equal risers is 7.33 in., shown to the nearest sixteenth for layout. Making one riser shorter to keep the others round would break the 3/8 in. rule and trip people on the odd step.

    Related tools

    Drywall Calculator

    Sheets, joint compound, tape and screws for a room or one wall - See the calculator

    Concrete Calculator

    Cubic yards and bags for a slab, footing or sidewalk - See the calculator

    Rebar Calculator

    Bar count and length for a grid in a slab or landing - See the calculator

    Slab Formwork Calculator

    Form boards and supports for a poured slab - See the calculator

    Paving Stone Calculator

    Pavers, base and sand for the walk that leads to the steps - See the calculator

    Decking Calculator

    Boards and fasteners if the landing becomes a wooden deck - See the calculator

    Roof Pitch Calculator

    Rise over run as pitch, degrees and percent, the same geometry as a stair - See the calculator

    House Building Cost Calculator

    Budget for the whole build, outdoor concrete included - See the calculator

    Similar calculators from this section