Consumer unit for 8 outlet circuits - module count and board size

    Size a consumer unit from your circuit count. The calculator adds up breaker modules, RCDs, the main switch and any extras, applies a spare-capacity margin, and recommends the smallest standard enclosure that fits.

    Planning an installation with 8 outlet circuits means your consumer unit needs at least 8 breaker modules just for sockets - before you count lighting, dedicated appliances or RCDs. A typical setup with 8 outlet circuits also includes 3-5 lighting circuits and 2-4 dedicated runs (oven, hob, EV charger), pushing the real module count well beyond 8. Enter your full circuit breakdown below and the calculator recommends the smallest standard enclosure - 12, 24, 36, 48 or 60 modules - with enough spare capacity for future expansion.

    Parameters

    Enter data for calculations

    Each = 1 module (B10A breaker).

    Each = 1 module (B16A breaker).

    Each = 1 module (B20A-B32A breaker).

    Each = 2 modules (RCD 30 mA).

    Main isolator in the consumer unit.

    SPD, contactors, timers, meters etc.

    Affects installation method and appearance.

    Empty modules for future expansion.

    Optional - for cost estimate.

    Optional - for cost estimate.

    Form progress0 / 7 fields

    💡 Fill in all required fields to unlock the calculate button

    What this calculator does

    A distribution board (consumer unit) holds every breaker, RCD and ancillary device that protects the circuits in a building. Getting the enclosure size wrong is expensive: too small and you run out of DIN-rail space before the last circuit is wired; too large and you overspend on a box that stays half-empty for years. This calculator counts the modules for you. Feed in your lighting, outlet and dedicated circuit numbers, pick the RCD strategy and spare-capacity margin, and it recommends the smallest standard enclosure - 12, 24, 36, 48, 60 or 72 modules - that fits everything with room to grow.

    Quick-start example

    Typical three-bedroom house
    5 lighting circuits + 7 outlet circuits + 3 dedicated (oven, hob, EV charger) = 15 breakers (15 modules).
    Auto RCDs: ceil(15/6) = 3 RCDs (6 modules). Main switch 3P (3 modules). SPD Type 2 (2 modules).
    Net: 26 modules. With 30% spare: ceil(26 x 1.3) = 34 modules. Recommended: 3x12 (36-module) flush-mount board with 10 spare slots.

    How to use this calculator - step by step

    1. Lighting circuits - each takes 1 module (B10A breaker). One circuit per 1-2 rooms.
    2. Outlet circuits - each takes 1 module (B16A breaker). One per room group, separate for kitchen/bathroom.
    3. Dedicated circuits - each takes 1 module (B20A-B32A). Oven, hob, boiler, AC, EV charger.
    4. RCDs - each takes 2 modules. Auto mode assigns 1 RCD per 6 circuits. Override if your design groups differently.
    5. Main switch - 3-pole isolator (3 mod.) for three-phase, 1-pole (1 mod.) for single-phase, or none if the main switch is in the meter box.
    6. Additional modules - surge protectors, contactors, timers, DIN-rail meters. Enter the total module count.
    7. Mounting type - flush (recessed) or surface (on wall face).
    8. Spare capacity - 30% recommended, 40% for new builds expecting future loads (AC, solar, EV).
    9. Read results: total modules, recommended enclosure size, equipment table and optional cost estimate.

    Standard enclosure sizes

    Size Modules DIN rows Typical use
    1x12 12 1 Studio, small sub-board
    2x12 24 2 Apartment up to 70 m2
    3x12 36 3 House 80-140 m2
    4x12 48 4 House 140-200 m2, commercial
    5x12 60 5 Large house with solar, EV, AC
    6x12 72 6 Large commercial, multi-zone

    Scenarios

    Scenario 1: One-bedroom apartment, 45 m2
    2 lighting + 3 outlet + 1 dedicated = 6 circuits. 1 RCD (2 mod). 1P switch (1 mod). Net: 9 modules, 30% spare = 12. Board: 1x12.
    Scenario 2: Three-bedroom apartment, 95 m2
    4 lighting + 5 outlet + 3 dedicated = 12 circuits. 2 RCDs (4 mod). 3P switch (3 mod). Net: 19 modules, 30% = 25. Board: 3x12 (36). Spare: 17 slots.
    Scenario 3: Detached house, 160 m2, EV charger + AC
    6 lighting + 8 outlet + 5 dedicated = 19 circuits. 4 RCDs (8 mod). 3P switch (3 mod). SPD Type 2 (2 mod). Net: 32 modules, 30% = 42. Board: 4x12 (48). Spare: 16 slots.
    Scenario 4: Commercial unit, 250 m2
    8 lighting + 10 outlet + 6 dedicated = 24 circuits. 4 RCDs (8 mod). 3P switch (3 mod). SPD 1+2 (4 mod). Meter (4 mod). Net: 43 modules, 30% = 56. Board: 5x12 (60).
    Scenario 5: Garage sub-board
    1 lighting + 2 outlet + 1 dedicated = 4 circuits. 1 RCD (2 mod). No main switch (fed from house board). Net: 6 modules, 30% = 8. Board: 1x12, surface-mount.

    FAQ - Frequently asked questions

    How many RCDs does a house need?
    The standard rule is max 6 circuits per RCD. A 15-circuit house needs at least 3 RCDs. Some electricians prefer one RCD per room type (lighting, sockets, dedicated) so a single trip does not black out the whole house. Each RCD takes 2 DIN modules.
    What is the difference between flush-mount and surface-mount boards?
    Flush-mount boards sit inside the wall (a cavity is chased or built during construction). They look neater and are standard in living areas. Surface-mount boards are screwed onto the wall face - faster to install and easier to access, but they stick out 10-15 cm. Common in garages, basements and utility rooms. Both accept the same DIN-rail modules.
    Why leave 30% spare capacity?
    Future additions - air conditioning, EV charger, home battery, solar inverter disconnect - each need 1-4 extra modules. Adding spare modules during initial installation costs a few dollars. Replacing the entire board later means re-chasing the wall, re-terminating every cable and paying an electrician for a full day. Industry standard is 30%; new builds should aim for 40%.
    Do I need a main switch in the consumer unit?
    If the meter box has a main isolator that can disconnect the entire installation, a second one inside the consumer unit is optional. Most three-phase houses include a 3-pole isolator (3 modules) in the board for convenience - it lets you kill all power without going to the meter. Single-phase apartments often use a 1-pole isolator (1 module).
    What goes into the "additional modules" field?
    Anything beyond breakers, RCDs and the main switch: surge protector SPD Type 1+2 (4 modules), SPD Type 2 (2 modules), lighting contactor (1-2 modules), timer switch (2 modules), DIN-rail energy meter (4-6 modules), priority relay (2 modules). Add up the modules for all planned devices and enter the total.
    Can I use a 24-module board for a house?
    Only for very small houses (under 80 m2) with minimal dedicated circuits. A typical 120 m2 house with 12-15 circuits, 2-3 RCDs, a main switch and an SPD already occupies 22-25 modules net. With 30% spare that pushes to 30+, which means a 36-module (3x12) board minimum. Starting with 24 modules almost guarantees a board swap within a few years.

    Related tools

    Electrical Cable Length Calculator

    Calculate cable metres by cross-section for every circuit in the building - Open calculator

    Drywall Anchor Calculator

    Fastener count and packages for direct-mount plasterboard systems - Open calculator

    House Building Cost Calculator

    Estimate total build cost per square metre including electrical installation - Open calculator

    Plumbing Pipe Calculator

    Pipe lengths and fittings for water supply and heating systems - Open calculator

    Insulation Calculator

    Calculate insulation thickness and R-value for walls and attics - Open calculator

    Calculator verified by the LiczGrupa.pl team

    Content, formulas and results have been reviewed for accuracy and relevance by our team of specialists.

    Patryk Matyjasik

    Reviewed by: Patryk Matyjasik