Do the same job four times faster and it needs four times the power, though nothing else about it changes. Give it a work figure and a time for watts, kilowatts, mechanical hp, metric PS and BTU/h.
Mechanical Power Calculator - Watts from Work and Time
Do the same job four times faster and it needs four times the power, though nothing else about it changes. Give it a work figure and a time for watts, kilowatts, mechanical hp, metric PS and BTU/h.
Parameters
Enter data for calculations
💡 Fill in all required fields to unlock the calculate button
Two winches, one crate, and a factor of four
A 250 kg crate has to go up 3 m. That is 7,354.99 J of work, and no choice of winch will change it. One winch does the lift in 60 s and needs 122.6 W. The other does it in 15 s and needs 490.3 W, four times as much, for a job that is identical at both ends. That gap is what power measures, and it is why a work figure on its own cannot tell you what motor to buy.
A work figure on its own
- Tells you what the job costs in total
- Cannot size a motor, a cable or a fuse
- Cannot be compared against an appliance rating
- Says nothing about whether the job is even possible in the time you have
The same figure with a time
- Becomes watts, the unit every machine is rated in
- Sits directly against a bulb, a kettle or an engine
- Scales in exact inverse proportion to the schedule
- Divides by an efficiency to give the power actually drawn
Power is work with a clock attached
The formula is P = W ÷ t. One watt is one joule per second, which makes the watt an unusually honest unit: it says out loud that it is a rate rather than an amount. Everything awkward about power follows from that single fact, including the reason a bill is measured in kilowatt hours rather than kilowatts, and the reason a machine rated at 2.2 kW can be described as consuming nothing at all when it is switched off.
Run the crate example through it and the arithmetic is unremarkable: 7,354.99 J divided by 60 s is 122.58 W, which the calculator also reports as 0.16439 hp, 0.16667 PS and 418.27 BTU/h. Lifting a 20 kg case into an overhead bin, worth 235.4 J, in a brisk 2 s comes to 117.7 W. Two very different jobs, near enough the same power, because the second one is small and fast while the first is large and slow.
The same job on seven different schedules
This is the table the tool prints under every result, built from your own two numbers with your own schedule highlighted. The work never changes down the column. Only the clock does, and the power follows it in exact inverse proportion.
| Schedule | Time | Power needed | Against 60 s |
|---|---|---|---|
| In a quarter of the time | 15.0 s | 490.3 W | 4.00x |
| In half the time | 30.0 s | 245.2 W | 2.00x |
| A quarter faster | 45.0 s | 163.4 W | 1.33x |
| As entered | 1 min | 122.6 W | 1.00x |
| Half as long again | 1 min 30 s | 81.72 W | 0.67x |
| In twice the time | 2 min | 61.29 W | 0.50x |
| In four times the time | 4 min | 30.65 W | 0.25x |
There is a practical rule buried in that column. If a motor is marginal, buying time is far cheaper than buying watts: stretching a lift from 60 s to 90 s, a delay nobody would notice, drops the requirement by a third, from 122.6 W to 81.72 W. Going the other way is brutal. Shaving the same lift to 15 s costs four times the power for three quarters of a minute saved.
What the three fields want
- What to solve for - the power, the work or the time. Nothing else appears until this is set, and no option is preselected.
- Work unit - joules, kilojoules, megajoules, kilowatt hours or kilocalories, at 3,600,000 J to the kWh and 4,184 J to the kcal.
- Time unit - seconds, minutes, hours or days. Answers in the time mode come back both as a plain figure in your chosen unit and broken into days, hours, minutes and seconds.
- Power unit - watts, kilowatts, megawatts, mechanical horsepower or metric PS. The two horsepowers are different constants and the tool keeps them apart; the section below explains why that matters.
- Work - the total energy the job takes. If you have a force and a distance rather than a work figure, the work calculator will turn them into one.
- Time - how long the job takes from start to finish. This is elapsed time, including any part of it where the machine is loafing, which is exactly why the answer is an average.
- Power - only when solving for work or time. This is useful power delivered to the load, not the power drawn from the wall.
From a bulb to a locomotive
Watts span seven orders of magnitude between the things people meet in a day, which is why a bare figure needs somewhere to sit. The tool slots your own result into this ladder at the right rung.
| Power source | Where the figure comes from | Power |
|---|---|---|
| An LED bulb | its rating | 10.00 W |
| A person pedaling steadily | typical sustained output at the pedals | 75.00 W |
| A person climbing stairs | typical short burst | 300.0 W |
| One mechanical horsepower | 550 ft lbf per second, by definition | 745.7 W |
| A trained cyclist sprinting | typical peak | 1.50 kW |
| An electric kettle on a 230 V supply | typical rating; a 120 V kettle is limited to about 1.5 kW | 2.20 kW |
| A small car engine, 100 hp | 100 x 745.69987 W | 74.57 kW |
| A city bus engine, 300 hp | 300 x 745.69987 W | 223.71 kW |
| An electric locomotive | typical continuous rating | 5.00 MW |
The crate winch at 122.6 W lands between a person pedaling steadily and a person taking the stairs, which is a fair description of the job: one person could do it, slowly, and would rather not. Push the same lift to 15 s and its 490.3 W jumps above the stair-climbing burst and heads for the horsepower line.
Two horsepowers, and the 1.4 percent between them
What people get wrong about watts
Related tools
Work Calculator
For the W in this formula when what you have is a force, a distance and an angle - See the calculator
Potential Energy Calculator
For the work in a lift when you have a mass and a height, which is where the crate figure above came from - See the calculator
Kinetic Energy Calculator
For the work needed to bring something up to speed rather than up to a height - See the calculator
Force Calculator
For the force a load actually applies, which is the first number most of these calculations need - See the calculator
Engine Power Calculator
For converting a published engine rating between kW, hp and PS, rather than deriving a power from a job - See the calculator
Electricity Usage Calculator
For the other end of the same relationship, where a rating and a running time turn into kilowatt hours - See the calculator