Push Through or Deload? What Your Training Log Says

Push through or deload? Compare a straight linear plan with a waved one that schedules a deload, using weekly load, monotony, ACWR and your last sessions.

Natalia Skrzek · 9 October 2026 · 10 min read
Push through or deload? What your training log says

"Add weight when you can, back off when you must." Most lifting advice fits in that sentence, and almost every argument in a gym starts with its second half. When exactly is "must"? When the bar slows down? When the last set grinds? When your knees start talking to you on the stairs?

There are two honest answers, and they make two different plans. The first says push through: keep adding weight every session for as long as it works, and only back off when the log forces you to. The second says wave the week, add reps before weight, and put a lighter week in the plan before you need it. Both have produced strong people. They are not equally good at everything, and the difference shows up in numbers you can work out from an ordinary training log.

This article runs both plans for the same lifter through the Training Monotony Calculator for the shape of the week, the Deload Calculator for when to back off, and the Progressive Overload Calculator for what goes on the bar. No invented athlete, just a typical intermediate lifter: five sessions a week, a squat at 185 lb for 3 sets of 5, and a few quieter weeks behind them, around 1,550 AU of training load each.

The two plans, side by side

Plan A, push through: five sessions of 60 minutes, every one at a session RPE of 7, linear progression on the squat with a jump after every good session, and no deload until the bar stops moving. Plan B, wave and deload: two hard days of 75 minutes at RPE 8, one medium day of 60 minutes at RPE 7, two easy days of 40 minutes at RPE 4, double progression on the squat (5 to 8 reps before the weight goes up), and a planned lighter week every six weeks. The table puts the two next to each other on everything the calculators measure.

What is measuredPlan A: push throughPlan B: wave and deload
Weekly training load2,100 AU1,940 AU
Monotony (daily mean / SD)1.581.15
Strain (load x monotony)3,3202,222
ACWR after quieter weeks of about 1,550 AU1.351.25
Change on the week before (1,600 AU)+31.3%+21.3%
Squat jump per good session+10 lb (5.4%)+10 lb, after 8 reps
Squat 185 to 315 lb, best case13 sessions, 4.3 weeks49 sessions, 16.3 weeks
When the deload comeswhen the bar stopsevery 6 weeks, earlier on signals
Deload week, sets per weeknone planned60 to 36
Deload week, squatnone planned2 x 5 at 220 lb

Read it as a trade. Plan A does more work, about 8% more each week, and gets to 315 lb more than three times faster on paper. Plan B carries a third less strain, keeps its ACWR inside the 0.8-1.3 band Gabbett called the sweet spot, and has a lighter week written down before anyone needs it. Note what neither plan escapes: both weeks are big jumps on 1,600 AU, at +31.3% and +21.3%, well past the 10% weekly increase Gabbett advised. Coming back from quieter weeks, both should ramp in, not start at full volume.

Training Monotony Calculator: Plan A week of five 60-minute sessions at RPE 7 after earlier weeks of 1,600, 1,500 and 1,550 AU: 2,100 AU, monotony 1.58, ACWR 1.35, +31.3% on the week before
Training Monotony Calculator: Plan A week of five 60-minute sessions at RPE 7 after earlier weeks of 1,600, 1,500 and 1,550 AU: 2,100 AU, monotony 1.58, ACWR 1.35, +31.3% on the week before

When pushing through wins

You are early, and the bar is still moving every session

Linear progression is the fastest thing in lifting while it lasts. At 185 lb the calculator gives the squat a jump of 10 lb, which is 5.4% of the bar, inside the ACSM range of 2-10%. The next six sessions read 195, 205, 215, 225, 235 and 245 lb, and 315 lb arrives on session 13, about 4.3 weeks at three squat days a week. Double progression at 5-8 reps needs 49 sessions for the same 130 lb, because every weight has to be climbed through four rep counts first. If you can still add weight every session, a rep range just slows you down. The squat example and the bench example show the jump for each lift: 10 lb on the squat, 5 lb on the bench at the same 185 lb.

Progressive Overload Calculator: linear, lower-body compound, 3 x 5 at 185 lb, both sessions made, goal 315 lb at three sessions a week: go up to 195 lb, 315 lb on session 13, about 4.3 weeks
Progressive Overload Calculator: linear, lower-body compound, 3 x 5 at 185 lb, both sessions made, goal 315 lb at three sessions a week: go up to 195 lb, 315 lb on session 13, about 4.3 weeks

One bad session is just one bad session

Pushing through also means not panicking. Miss a rep at 275 lb, with 4 instead of 5 in the weakest set, and the calculator says repeat 275 lb. Only a second miss in a row triggers a reset, and even then it is a modest one: about 10% off, rounded down to 245 lb, and you build up again in 15 lb steps. Plenty of lifters deload far too early because one tired Tuesday felt like a plateau.

The week is already varied

Plan A only looks uniform because every session is the same 60 minutes at RPE 7. Two rest days still keep its monotony at 1.58, under the warning line of 2.0. If your own push-through week has rest days and some variety in it, monotony alone gives you no reason to change course. The monotony calculator turns that into one number in a minute.

When the wave and the deload win

The lifts stall and you are tired

Four weeks into a block, squats stuck, energy down: the Deload Calculator does not wait for the six-week plan. Stalled lifts plus fatigue count as a signal, so the answer is now, as a reactive deload. With the volume type picked, 60 working sets a week become 30, and 3 x 5 at 245 lb becomes 2 x 5 at the same 245 lb with at least 3 reps left in the tank, a tonnage down from 3,675 lb to 2,450 lb. One week, then back to work.

Deload Calculator: 4 weeks since the last deload, intermediate, lifts stalled, tired, volume deload, 60 sets a week, 3 x 5 at 245 lb with 1 rep in reserve: deload now, 30 sets, 2 x 5 at 245 lb
Deload Calculator: 4 weeks since the last deload, intermediate, lifts stalled, tired, volume deload, 60 sets a week, 3 x 5 at 245 lb with 1 rep in reserve: deload now, 30 sets, 2 x 5 at 245 lb

Your joints complain more than your muscles

Nine weeks in, lifts falling and joints aching: a reactive deload again, but a different kind. When the bar feels crushing, the intensity type keeps the sets and takes 15% off the weight: 245 lb becomes 205 lb, rounded down to 5 lb, and the tonnage falls only 16%. Pain that lasts past that lighter week is a job for a physical therapist, not another deload, and the calculator says so in the result.

You keep training long after the plan said stop

Lifters surveyed in strength and physique sports deloaded every 5.6 weeks on average and kept each deload to about 6.4 days. For an intermediate lifter the calculator plans every 6 weeks. The question people actually type, whether to deload every 4, 6 or 8 weeks, gets three different answers: at 4 weeks it says wait two more, at 6 weeks it says now, and at 8 weeks it says now, two weeks late. Beginners get more room: every 8 weeks, because lighter weights build less fatigue.

Plan B's planned deload at week six is the mixed type: 60 sets become 36, and the squat goes from 3 x 5 at 245 lb to 2 x 5 at 220 lb, 40% less tonnage. Light work with dumbbells follows the same logic in reps: reach the top of the range twice, then move up, which is the dumbbell example where even the smallest step, 25 to 27.5 lb, is 10% of the weight.

The verdict, and why it depends on you

Plan A wins on speed and loses on margin. Plan B wins on margin and loses on speed. Neither is right for everyone, but the table below sorts most situations in a sentence.

Your situationBetter optionWhy
First year of lifting, every session still a PRPush througha jump per session is the fastest path, and fatigue is low
One missed session at a new weightPush throughrepeat it; reset only after two misses
Lifts stalled and you feel tiredDeload nowa reactive deload, volume type
Joints ache, the bar feels heavyDeload nowintensity type: same sets, 15% lighter
Six weeks or more without a lighter weekDeloadthe planned gap for an intermediate lifter
Coming back from quieter weeksWave, ramp inACWR and the weekly jump, not just the plan
Light dumbbells or accessoriesDouble progressionone plate is a big share of the weight

If you only take one line from this, take the order of questions. First, is the bar still moving? Then push. Second, did you miss twice, or do you feel tired and stuck? Then back off. Third, before anything else, did this week jump more than 10% on the last one? Then neither plan is your problem yet, the ramp is. All three answers come out of a log you already keep.

What to write down after every session

Both plans run on the same small log, and it takes less than a minute per session. Write the minutes the session lasted, warm-up included. Write one session RPE about half an hour after you finish, for the whole workout rather than the hardest set. For the main lift, write the weight and the reps in the weakest set, because that set decides whether the weight has really been beaten. At the end of the week, add up the minutes times RPE and keep the total next to the last three weeks.

That is all the input the calculators need. The weekly totals give you monotony, strain and the jump on last week. The weakest sets of the last two sessions give you the next bar weight. Weeks since the last lighter week, plus an honest answer about how you feel, give you the deload timing. None of it needs a watch, a power meter or a coach, and none of it works if the log only gets filled in on good days.

Tools discussed in this article

  • Training Monotony Calculator - weekly load by the session RPE method, monotony, strain and ACWR from the minutes and RPE of each day.
  • Deload Calculator - when to take a lighter week by experience, lifts and fatigue, and the sets and weight to keep on your main lift in lb or kg.
  • Progressive Overload Calculator - the next session's weight from your last two, in linear or double progression, with six sessions planned ahead.

Ready-made calculations from this article

More sports tools